Simulation and analytical techniques for construction resource planning and scheduling

Shih Ming Chen, Fletcher Griffis, Po Han Chen, Luh Maan Chang

Research output: Contribution to journalArticle

Abstract

To date, few construction methods or models in the literature have discussed about helping the project managers decide the near-optimum distributions of manpower, material, equipment and space according to their project objectives and project constraints. Thus, the traditional scheduling methods or models often result in a "seat-of-the-pants" style of management, rather than decision making based on an analysis of real data. This paper presents an intelligent scheduling system (ISS) that can help the project managers to find the near-optimum schedule plan according to their project objectives and project constraints. ISS uses simulation techniques to distribute resources and assign different levels of priorities to different activities in each simulation cycle to find the near-optimal solution. ISS considers and integrates most of the important construction factors (schedule, cost, space, manpower, equipment and material) simultaneously in a unified environment, which makes the resulting schedule that will be closer to optimal. Furthermore, ISS allows for what-if analyses of possible scenarios, and schedule adjustments based on unforeseen conditions (change orders, late material delivery, etc.). Finally, two sample applications and one real-world construction project are utilized to illustrate and compare the effectiveness of ISS with two widely used software packages, Primavera Project Planner and Microsoft Project.

Original languageEnglish (US)
Pages (from-to)99-113
Number of pages15
JournalAutomation in Construction
Volume21
Issue number1
DOIs
StatePublished - Jan 2012

Fingerprint

Scheduling
Planning
Managers
Seats
Software packages
Decision making
Costs

Keywords

  • Artificial intelligence
  • Computerized scheduling
  • Optimization
  • Resource management
  • Simulation

ASJC Scopus subject areas

  • Control and Systems Engineering
  • Civil and Structural Engineering
  • Building and Construction

Cite this

Simulation and analytical techniques for construction resource planning and scheduling. / Chen, Shih Ming; Griffis, Fletcher; Chen, Po Han; Chang, Luh Maan.

In: Automation in Construction, Vol. 21, No. 1, 01.2012, p. 99-113.

Research output: Contribution to journalArticle

Chen, Shih Ming ; Griffis, Fletcher ; Chen, Po Han ; Chang, Luh Maan. / Simulation and analytical techniques for construction resource planning and scheduling. In: Automation in Construction. 2012 ; Vol. 21, No. 1. pp. 99-113.
@article{0c77e5b330dd47ffbeea74655af8a2dd,
title = "Simulation and analytical techniques for construction resource planning and scheduling",
abstract = "To date, few construction methods or models in the literature have discussed about helping the project managers decide the near-optimum distributions of manpower, material, equipment and space according to their project objectives and project constraints. Thus, the traditional scheduling methods or models often result in a {"}seat-of-the-pants{"} style of management, rather than decision making based on an analysis of real data. This paper presents an intelligent scheduling system (ISS) that can help the project managers to find the near-optimum schedule plan according to their project objectives and project constraints. ISS uses simulation techniques to distribute resources and assign different levels of priorities to different activities in each simulation cycle to find the near-optimal solution. ISS considers and integrates most of the important construction factors (schedule, cost, space, manpower, equipment and material) simultaneously in a unified environment, which makes the resulting schedule that will be closer to optimal. Furthermore, ISS allows for what-if analyses of possible scenarios, and schedule adjustments based on unforeseen conditions (change orders, late material delivery, etc.). Finally, two sample applications and one real-world construction project are utilized to illustrate and compare the effectiveness of ISS with two widely used software packages, Primavera Project Planner and Microsoft Project.",
keywords = "Artificial intelligence, Computerized scheduling, Optimization, Resource management, Simulation",
author = "Chen, {Shih Ming} and Fletcher Griffis and Chen, {Po Han} and Chang, {Luh Maan}",
year = "2012",
month = "1",
doi = "10.1016/j.autcon.2011.05.018",
language = "English (US)",
volume = "21",
pages = "99--113",
journal = "Automation in Construction",
issn = "0926-5805",
publisher = "Elsevier",
number = "1",

}

TY - JOUR

T1 - Simulation and analytical techniques for construction resource planning and scheduling

AU - Chen, Shih Ming

AU - Griffis, Fletcher

AU - Chen, Po Han

AU - Chang, Luh Maan

PY - 2012/1

Y1 - 2012/1

N2 - To date, few construction methods or models in the literature have discussed about helping the project managers decide the near-optimum distributions of manpower, material, equipment and space according to their project objectives and project constraints. Thus, the traditional scheduling methods or models often result in a "seat-of-the-pants" style of management, rather than decision making based on an analysis of real data. This paper presents an intelligent scheduling system (ISS) that can help the project managers to find the near-optimum schedule plan according to their project objectives and project constraints. ISS uses simulation techniques to distribute resources and assign different levels of priorities to different activities in each simulation cycle to find the near-optimal solution. ISS considers and integrates most of the important construction factors (schedule, cost, space, manpower, equipment and material) simultaneously in a unified environment, which makes the resulting schedule that will be closer to optimal. Furthermore, ISS allows for what-if analyses of possible scenarios, and schedule adjustments based on unforeseen conditions (change orders, late material delivery, etc.). Finally, two sample applications and one real-world construction project are utilized to illustrate and compare the effectiveness of ISS with two widely used software packages, Primavera Project Planner and Microsoft Project.

AB - To date, few construction methods or models in the literature have discussed about helping the project managers decide the near-optimum distributions of manpower, material, equipment and space according to their project objectives and project constraints. Thus, the traditional scheduling methods or models often result in a "seat-of-the-pants" style of management, rather than decision making based on an analysis of real data. This paper presents an intelligent scheduling system (ISS) that can help the project managers to find the near-optimum schedule plan according to their project objectives and project constraints. ISS uses simulation techniques to distribute resources and assign different levels of priorities to different activities in each simulation cycle to find the near-optimal solution. ISS considers and integrates most of the important construction factors (schedule, cost, space, manpower, equipment and material) simultaneously in a unified environment, which makes the resulting schedule that will be closer to optimal. Furthermore, ISS allows for what-if analyses of possible scenarios, and schedule adjustments based on unforeseen conditions (change orders, late material delivery, etc.). Finally, two sample applications and one real-world construction project are utilized to illustrate and compare the effectiveness of ISS with two widely used software packages, Primavera Project Planner and Microsoft Project.

KW - Artificial intelligence

KW - Computerized scheduling

KW - Optimization

KW - Resource management

KW - Simulation

UR - http://www.scopus.com/inward/record.url?scp=81355138778&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=81355138778&partnerID=8YFLogxK

U2 - 10.1016/j.autcon.2011.05.018

DO - 10.1016/j.autcon.2011.05.018

M3 - Article

AN - SCOPUS:81355138778

VL - 21

SP - 99

EP - 113

JO - Automation in Construction

JF - Automation in Construction

SN - 0926-5805

IS - 1

ER -