Production scheduling with significant changeover costs

Research output: Contribution to journalArticle

Abstract

A production scheduling program with significant changeover costs is considered. This entails the determination of a step production function where the production levels and decision time are unknown. The production scheduling problem is formulated as an optimal control problem and amended to a k-stage discrete control problem. Extensions to multi-products, production scheduling on one machine and uncertain demand are then considered.

Original languageEnglish (US)
Pages (from-to)33-44
Number of pages12
JournalZeitschrift für Operations Research
Volume17
Issue number1
DOIs
StatePublished - Feb 1 1973