    This paper presents an approach to address pavement management decision problems at airports with multiple runways. It relaxes some of the underlying assumptions made in previous studies and explicitly considers time requirements for runway reconstruction, deterioration dependence on traffic levels, and the growth of traffic demand over time. A finite-horizon dynamic program is formulated to investigate the interplays among maintenance and repair (M&R) action time, functional interdependence between runways, and traffic growth. Results from computational studies reveal these interplays, in particular the tradeoff between present M&R action and delay cost and long-term benefits brought by significantly upgrading pavement conditions through reconstructing runways. Sensitivity analyses suggest that baseline demand, demand growth rate, and the parameter differentiating traffic-dependent transition probabilities significantly affect optimal M&R decisions and total expected cost to go.

    Original languageEnglish (US)
    Pages (from-to)183-193
    Number of pages11
    JournalJournal of Infrastructure Systems
    Volume18
    Issue number3
    DOIs
    StatePublished - Dec 1 2012

    Fingerprint

    Airport runways
    Pavements
    Airports
    Deterioration
    Costs
    Repair

    Keywords

    • Airport and airfield runways
    • Infrastructure
    • Pavement management
    • Traffic delay

    ASJC Scopus subject areas

    • Civil and Structural Engineering

    Cite this

    Incorporating delay effects into airport runway pavement management systems. / Zou, Bo; Madanat, Samer.

    In: Journal of Infrastructure Systems, Vol. 18, No. 3, 01.12.2012, p. 183-193.

    Research output: Contribution to journalArticle

    @article{836a441505af4d688d413c5e2d84ef91,
    title = "Incorporating delay effects into airport runway pavement management systems",
    abstract = "This paper presents an approach to address pavement management decision problems at airports with multiple runways. It relaxes some of the underlying assumptions made in previous studies and explicitly considers time requirements for runway reconstruction, deterioration dependence on traffic levels, and the growth of traffic demand over time. A finite-horizon dynamic program is formulated to investigate the interplays among maintenance and repair (M&R) action time, functional interdependence between runways, and traffic growth. Results from computational studies reveal these interplays, in particular the tradeoff between present M&R action and delay cost and long-term benefits brought by significantly upgrading pavement conditions through reconstructing runways. Sensitivity analyses suggest that baseline demand, demand growth rate, and the parameter differentiating traffic-dependent transition probabilities significantly affect optimal M&R decisions and total expected cost to go.",
    keywords = "Airport and airfield runways, Infrastructure, Pavement management, Traffic delay",
    author = "Bo Zou and Samer Madanat",
    year = "2012",
    month = "12",
    day = "1",
    doi = "10.1061/(ASCE)IS.1943-555X.0000086",
    language = "English (US)",
    volume = "18",
    pages = "183--193",
    journal = "Journal of Infrastructure Systems",
    issn = "1076-0342",
    publisher = "American Society of Civil Engineers (ASCE)",
    number = "3",

    }

    TY - JOUR

    T1 - Incorporating delay effects into airport runway pavement management systems

    AU - Zou, Bo

    AU - Madanat, Samer

    PY - 2012/12/1

    Y1 - 2012/12/1

    N2 - This paper presents an approach to address pavement management decision problems at airports with multiple runways. It relaxes some of the underlying assumptions made in previous studies and explicitly considers time requirements for runway reconstruction, deterioration dependence on traffic levels, and the growth of traffic demand over time. A finite-horizon dynamic program is formulated to investigate the interplays among maintenance and repair (M&R) action time, functional interdependence between runways, and traffic growth. Results from computational studies reveal these interplays, in particular the tradeoff between present M&R action and delay cost and long-term benefits brought by significantly upgrading pavement conditions through reconstructing runways. Sensitivity analyses suggest that baseline demand, demand growth rate, and the parameter differentiating traffic-dependent transition probabilities significantly affect optimal M&R decisions and total expected cost to go.

    AB - This paper presents an approach to address pavement management decision problems at airports with multiple runways. It relaxes some of the underlying assumptions made in previous studies and explicitly considers time requirements for runway reconstruction, deterioration dependence on traffic levels, and the growth of traffic demand over time. A finite-horizon dynamic program is formulated to investigate the interplays among maintenance and repair (M&R) action time, functional interdependence between runways, and traffic growth. Results from computational studies reveal these interplays, in particular the tradeoff between present M&R action and delay cost and long-term benefits brought by significantly upgrading pavement conditions through reconstructing runways. Sensitivity analyses suggest that baseline demand, demand growth rate, and the parameter differentiating traffic-dependent transition probabilities significantly affect optimal M&R decisions and total expected cost to go.

    KW - Airport and airfield runways

    KW - Infrastructure

    KW - Pavement management

    KW - Traffic delay

    UR - http://www.scopus.com/inward/record.url?scp=84876696513&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=84876696513&partnerID=8YFLogxK

    U2 - 10.1061/(ASCE)IS.1943-555X.0000086

    DO - 10.1061/(ASCE)IS.1943-555X.0000086

    M3 - Article

    AN - SCOPUS:84876696513

    VL - 18

    SP - 183

    EP - 193

    JO - Journal of Infrastructure Systems

    JF - Journal of Infrastructure Systems

    SN - 1076-0342

    IS - 3

    ER -