ICARUS. A status report

C. Montanari, Francesco Arneodo, P. Benetti, A. Bettini, A. Borio, E. Calligarich, C. Carpanese, D. Cavalli, F. Cavanna, P. Cennini, S. Centro, A. Cesana, C. Chen, Y. B. Chen, D. Cline, R. Dolfini, A. Ferrari, A. Gigli Berzolari, K. L. He, X. P. Huang & 40 others F. Lu, Z. H. Li, J. M. Ma, G. Mannocchi, F. Mauri, L. Mazzone, M. Nicoletto, S. Otwinowski, S. Parlati, D. Pascoli, A. Pepato, L. Periale, G. Piano-Mortari, A. Piazzoli, P. Picchi, F. Pietropaolo, A. Rappoldi, G. L. Raselli, S. Resconi, J. P. Revol, M. Rossella, C. Rossi, A. Rubbia, C. Rubbia, P. Sala, D. Scannicchio, F. Sergiampietri, S. Suzuki, M. Terrani, P. Torre, S. Ventura, M. Verdecchia, C. Vignoli, H. Wang, J. Woo, G. F. Xu, Z. Q. Xu, C. Zhang, Q. J. Zhang, S. C. Zheng

    Research output: Contribution to journalArticle

    Abstract

    The latest evolutions of the ICARUS project are reviewed. During the present year the collaboration has been heavily involved into the construction of the first full scale prototypes of the 600 ton ICARUS detector. Cryogenic and purification tests as well as mechanical tests on a wires chamber module, are presently under completion. No major problems were found and we foresee to be ready for the commissioning of the major detector components by the end of the present year. Also, the Long Baseline Neutrino Oscillation program has been subject to a rapid acceleration. Following our formal proposal, submitted and approved at the beginning of this year by the CERN SPSLC, a working group has been formed to study the details of the beam and a sensitive program has been formulated by which first neutrinos can be sent to the Gran Sasso at the end of year 2001.

    Original languageEnglish (US)
    Pages (from-to)453-457
    Number of pages5
    JournalNuclear Physics B - Proceedings Supplements
    Volume70
    Issue number1-3
    DOIs
    StatePublished - Jan 1 1999

    Fingerprint

    neutrinos
    detectors
    purification
    cryogenics
    proposals
    modules
    chambers
    prototypes
    wire
    oscillations

    ASJC Scopus subject areas

    • Atomic and Molecular Physics, and Optics
    • Nuclear and High Energy Physics

    Cite this

    Montanari, C., Arneodo, F., Benetti, P., Bettini, A., Borio, A., Calligarich, E., ... Zheng, S. C. (1999). ICARUS. A status report. Nuclear Physics B - Proceedings Supplements, 70(1-3), 453-457. https://doi.org/10.1016/S0920-5632(98)00469-1

    ICARUS. A status report. / Montanari, C.; Arneodo, Francesco; Benetti, P.; Bettini, A.; Borio, A.; Calligarich, E.; Carpanese, C.; Cavalli, D.; Cavanna, F.; Cennini, P.; Centro, S.; Cesana, A.; Chen, C.; Chen, Y. B.; Cline, D.; Dolfini, R.; Ferrari, A.; Gigli Berzolari, A.; He, K. L.; Huang, X. P.; Lu, F.; Li, Z. H.; Ma, J. M.; Mannocchi, G.; Mauri, F.; Mazzone, L.; Nicoletto, M.; Otwinowski, S.; Parlati, S.; Pascoli, D.; Pepato, A.; Periale, L.; Piano-Mortari, G.; Piazzoli, A.; Picchi, P.; Pietropaolo, F.; Rappoldi, A.; Raselli, G. L.; Resconi, S.; Revol, J. P.; Rossella, M.; Rossi, C.; Rubbia, A.; Rubbia, C.; Sala, P.; Scannicchio, D.; Sergiampietri, F.; Suzuki, S.; Terrani, M.; Torre, P.; Ventura, S.; Verdecchia, M.; Vignoli, C.; Wang, H.; Woo, J.; Xu, G. F.; Xu, Z. Q.; Zhang, C.; Zhang, Q. J.; Zheng, S. C.

    In: Nuclear Physics B - Proceedings Supplements, Vol. 70, No. 1-3, 01.01.1999, p. 453-457.

    Research output: Contribution to journalArticle

    Montanari, C, Arneodo, F, Benetti, P, Bettini, A, Borio, A, Calligarich, E, Carpanese, C, Cavalli, D, Cavanna, F, Cennini, P, Centro, S, Cesana, A, Chen, C, Chen, YB, Cline, D, Dolfini, R, Ferrari, A, Gigli Berzolari, A, He, KL, Huang, XP, Lu, F, Li, ZH, Ma, JM, Mannocchi, G, Mauri, F, Mazzone, L, Nicoletto, M, Otwinowski, S, Parlati, S, Pascoli, D, Pepato, A, Periale, L, Piano-Mortari, G, Piazzoli, A, Picchi, P, Pietropaolo, F, Rappoldi, A, Raselli, GL, Resconi, S, Revol, JP, Rossella, M, Rossi, C, Rubbia, A, Rubbia, C, Sala, P, Scannicchio, D, Sergiampietri, F, Suzuki, S, Terrani, M, Torre, P, Ventura, S, Verdecchia, M, Vignoli, C, Wang, H, Woo, J, Xu, GF, Xu, ZQ, Zhang, C, Zhang, QJ & Zheng, SC 1999, 'ICARUS. A status report', Nuclear Physics B - Proceedings Supplements, vol. 70, no. 1-3, pp. 453-457. https://doi.org/10.1016/S0920-5632(98)00469-1
    Montanari C, Arneodo F, Benetti P, Bettini A, Borio A, Calligarich E et al. ICARUS. A status report. Nuclear Physics B - Proceedings Supplements. 1999 Jan 1;70(1-3):453-457. https://doi.org/10.1016/S0920-5632(98)00469-1
    Montanari, C. ; Arneodo, Francesco ; Benetti, P. ; Bettini, A. ; Borio, A. ; Calligarich, E. ; Carpanese, C. ; Cavalli, D. ; Cavanna, F. ; Cennini, P. ; Centro, S. ; Cesana, A. ; Chen, C. ; Chen, Y. B. ; Cline, D. ; Dolfini, R. ; Ferrari, A. ; Gigli Berzolari, A. ; He, K. L. ; Huang, X. P. ; Lu, F. ; Li, Z. H. ; Ma, J. M. ; Mannocchi, G. ; Mauri, F. ; Mazzone, L. ; Nicoletto, M. ; Otwinowski, S. ; Parlati, S. ; Pascoli, D. ; Pepato, A. ; Periale, L. ; Piano-Mortari, G. ; Piazzoli, A. ; Picchi, P. ; Pietropaolo, F. ; Rappoldi, A. ; Raselli, G. L. ; Resconi, S. ; Revol, J. P. ; Rossella, M. ; Rossi, C. ; Rubbia, A. ; Rubbia, C. ; Sala, P. ; Scannicchio, D. ; Sergiampietri, F. ; Suzuki, S. ; Terrani, M. ; Torre, P. ; Ventura, S. ; Verdecchia, M. ; Vignoli, C. ; Wang, H. ; Woo, J. ; Xu, G. F. ; Xu, Z. Q. ; Zhang, C. ; Zhang, Q. J. ; Zheng, S. C. / ICARUS. A status report. In: Nuclear Physics B - Proceedings Supplements. 1999 ; Vol. 70, No. 1-3. pp. 453-457.
    @article{7c8e33ed66bf4d85b67d8d243a827920,
    title = "ICARUS. A status report",
    abstract = "The latest evolutions of the ICARUS project are reviewed. During the present year the collaboration has been heavily involved into the construction of the first full scale prototypes of the 600 ton ICARUS detector. Cryogenic and purification tests as well as mechanical tests on a wires chamber module, are presently under completion. No major problems were found and we foresee to be ready for the commissioning of the major detector components by the end of the present year. Also, the Long Baseline Neutrino Oscillation program has been subject to a rapid acceleration. Following our formal proposal, submitted and approved at the beginning of this year by the CERN SPSLC, a working group has been formed to study the details of the beam and a sensitive program has been formulated by which first neutrinos can be sent to the Gran Sasso at the end of year 2001.",
    author = "C. Montanari and Francesco Arneodo and P. Benetti and A. Bettini and A. Borio and E. Calligarich and C. Carpanese and D. Cavalli and F. Cavanna and P. Cennini and S. Centro and A. Cesana and C. Chen and Chen, {Y. B.} and D. Cline and R. Dolfini and A. Ferrari and {Gigli Berzolari}, A. and He, {K. L.} and Huang, {X. P.} and F. Lu and Li, {Z. H.} and Ma, {J. M.} and G. Mannocchi and F. Mauri and L. Mazzone and M. Nicoletto and S. Otwinowski and S. Parlati and D. Pascoli and A. Pepato and L. Periale and G. Piano-Mortari and A. Piazzoli and P. Picchi and F. Pietropaolo and A. Rappoldi and Raselli, {G. L.} and S. Resconi and Revol, {J. P.} and M. Rossella and C. Rossi and A. Rubbia and C. Rubbia and P. Sala and D. Scannicchio and F. Sergiampietri and S. Suzuki and M. Terrani and P. Torre and S. Ventura and M. Verdecchia and C. Vignoli and H. Wang and J. Woo and Xu, {G. F.} and Xu, {Z. Q.} and C. Zhang and Zhang, {Q. J.} and Zheng, {S. C.}",
    year = "1999",
    month = "1",
    day = "1",
    doi = "10.1016/S0920-5632(98)00469-1",
    language = "English (US)",
    volume = "70",
    pages = "453--457",
    journal = "Nuclear and Particle Physics Proceedings",
    issn = "2405-6014",
    publisher = "Elsevier",
    number = "1-3",

    }

    TY - JOUR

    T1 - ICARUS. A status report

    AU - Montanari, C.

    AU - Arneodo, Francesco

    AU - Benetti, P.

    AU - Bettini, A.

    AU - Borio, A.

    AU - Calligarich, E.

    AU - Carpanese, C.

    AU - Cavalli, D.

    AU - Cavanna, F.

    AU - Cennini, P.

    AU - Centro, S.

    AU - Cesana, A.

    AU - Chen, C.

    AU - Chen, Y. B.

    AU - Cline, D.

    AU - Dolfini, R.

    AU - Ferrari, A.

    AU - Gigli Berzolari, A.

    AU - He, K. L.

    AU - Huang, X. P.

    AU - Lu, F.

    AU - Li, Z. H.

    AU - Ma, J. M.

    AU - Mannocchi, G.

    AU - Mauri, F.

    AU - Mazzone, L.

    AU - Nicoletto, M.

    AU - Otwinowski, S.

    AU - Parlati, S.

    AU - Pascoli, D.

    AU - Pepato, A.

    AU - Periale, L.

    AU - Piano-Mortari, G.

    AU - Piazzoli, A.

    AU - Picchi, P.

    AU - Pietropaolo, F.

    AU - Rappoldi, A.

    AU - Raselli, G. L.

    AU - Resconi, S.

    AU - Revol, J. P.

    AU - Rossella, M.

    AU - Rossi, C.

    AU - Rubbia, A.

    AU - Rubbia, C.

    AU - Sala, P.

    AU - Scannicchio, D.

    AU - Sergiampietri, F.

    AU - Suzuki, S.

    AU - Terrani, M.

    AU - Torre, P.

    AU - Ventura, S.

    AU - Verdecchia, M.

    AU - Vignoli, C.

    AU - Wang, H.

    AU - Woo, J.

    AU - Xu, G. F.

    AU - Xu, Z. Q.

    AU - Zhang, C.

    AU - Zhang, Q. J.

    AU - Zheng, S. C.

    PY - 1999/1/1

    Y1 - 1999/1/1

    N2 - The latest evolutions of the ICARUS project are reviewed. During the present year the collaboration has been heavily involved into the construction of the first full scale prototypes of the 600 ton ICARUS detector. Cryogenic and purification tests as well as mechanical tests on a wires chamber module, are presently under completion. No major problems were found and we foresee to be ready for the commissioning of the major detector components by the end of the present year. Also, the Long Baseline Neutrino Oscillation program has been subject to a rapid acceleration. Following our formal proposal, submitted and approved at the beginning of this year by the CERN SPSLC, a working group has been formed to study the details of the beam and a sensitive program has been formulated by which first neutrinos can be sent to the Gran Sasso at the end of year 2001.

    AB - The latest evolutions of the ICARUS project are reviewed. During the present year the collaboration has been heavily involved into the construction of the first full scale prototypes of the 600 ton ICARUS detector. Cryogenic and purification tests as well as mechanical tests on a wires chamber module, are presently under completion. No major problems were found and we foresee to be ready for the commissioning of the major detector components by the end of the present year. Also, the Long Baseline Neutrino Oscillation program has been subject to a rapid acceleration. Following our formal proposal, submitted and approved at the beginning of this year by the CERN SPSLC, a working group has been formed to study the details of the beam and a sensitive program has been formulated by which first neutrinos can be sent to the Gran Sasso at the end of year 2001.

    UR - http://www.scopus.com/inward/record.url?scp=0032622904&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=0032622904&partnerID=8YFLogxK

    U2 - 10.1016/S0920-5632(98)00469-1

    DO - 10.1016/S0920-5632(98)00469-1

    M3 - Article

    VL - 70

    SP - 453

    EP - 457

    JO - Nuclear and Particle Physics Proceedings

    JF - Nuclear and Particle Physics Proceedings

    SN - 2405-6014

    IS - 1-3

    ER -