Contextual information requirements of cost estimators from past construction projects

Semiha Ergan, Burcu Akinci

Research output: Contribution to journalArticle

Abstract

Past project data sources provide key information for construction cost estimators. Previous research studies show that relying only on one's own experience during estimation results in estimators' bias. Having and referring to historical databases, containing objective information on what happened in past projects, are essential for reducing estimators' biases. The first step toward development of useful project history databases is to understand what information estimators require from past projects. The research described in this paper targets estimators' information needs identified through interviews, brainstorming sessions, task analyses, and card games conducted with estimators with different experience levels and specialized in heavy/civil and commercial construction projects, and exploration of historical and standard databases available in companies to determine what is being currently represented. Findings show that estimators need contextual information, depicting the conditions under which specific production rates were achieved, so that they can identify which production rate would be more realistic to use during the production rate estimation of an activity in a new bid. Comparison of the contextual information needs identified in this research with information items available in historical data sources (such as company cost reports, RSMeans, previous studies) highlighted some gaps and important opportunities for improvements in those sources. The identified contextual information items are significant for practitioners in developing ways to augment their existing project history databases to make them more beneficial for estimators.

Original languageEnglish (US)
Pages (from-to)841-852
Number of pages12
JournalJournal of Construction Engineering and Management
Volume135
Issue number9
DOIs
StatePublished - 2009

Fingerprint

Costs
Industry
Information requirements
Construction project
Estimator
Data base
Information needs
Data sources

Keywords

  • Construction management
  • Costs
  • Data collection
  • Databases
  • Decision support systems
  • Information systems

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Strategy and Management
  • Industrial relations
  • Building and Construction

Cite this

Contextual information requirements of cost estimators from past construction projects. / Ergan, Semiha; Akinci, Burcu.

In: Journal of Construction Engineering and Management, Vol. 135, No. 9, 2009, p. 841-852.

Research output: Contribution to journalArticle

@article{d694c06b026c4c4dae7507028435b23f,
title = "Contextual information requirements of cost estimators from past construction projects",
abstract = "Past project data sources provide key information for construction cost estimators. Previous research studies show that relying only on one's own experience during estimation results in estimators' bias. Having and referring to historical databases, containing objective information on what happened in past projects, are essential for reducing estimators' biases. The first step toward development of useful project history databases is to understand what information estimators require from past projects. The research described in this paper targets estimators' information needs identified through interviews, brainstorming sessions, task analyses, and card games conducted with estimators with different experience levels and specialized in heavy/civil and commercial construction projects, and exploration of historical and standard databases available in companies to determine what is being currently represented. Findings show that estimators need contextual information, depicting the conditions under which specific production rates were achieved, so that they can identify which production rate would be more realistic to use during the production rate estimation of an activity in a new bid. Comparison of the contextual information needs identified in this research with information items available in historical data sources (such as company cost reports, RSMeans, previous studies) highlighted some gaps and important opportunities for improvements in those sources. The identified contextual information items are significant for practitioners in developing ways to augment their existing project history databases to make them more beneficial for estimators.",
keywords = "Construction management, Costs, Data collection, Databases, Decision support systems, Information systems",
author = "Semiha Ergan and Burcu Akinci",
year = "2009",
doi = "10.1061/(ASCE)CO.1943-7862.0000053",
language = "English (US)",
volume = "135",
pages = "841--852",
journal = "Journal of Construction Engineering and Management - ASCE",
issn = "0733-9364",
publisher = "American Society of Civil Engineers (ASCE)",
number = "9",

}

TY - JOUR

T1 - Contextual information requirements of cost estimators from past construction projects

AU - Ergan, Semiha

AU - Akinci, Burcu

PY - 2009

Y1 - 2009

N2 - Past project data sources provide key information for construction cost estimators. Previous research studies show that relying only on one's own experience during estimation results in estimators' bias. Having and referring to historical databases, containing objective information on what happened in past projects, are essential for reducing estimators' biases. The first step toward development of useful project history databases is to understand what information estimators require from past projects. The research described in this paper targets estimators' information needs identified through interviews, brainstorming sessions, task analyses, and card games conducted with estimators with different experience levels and specialized in heavy/civil and commercial construction projects, and exploration of historical and standard databases available in companies to determine what is being currently represented. Findings show that estimators need contextual information, depicting the conditions under which specific production rates were achieved, so that they can identify which production rate would be more realistic to use during the production rate estimation of an activity in a new bid. Comparison of the contextual information needs identified in this research with information items available in historical data sources (such as company cost reports, RSMeans, previous studies) highlighted some gaps and important opportunities for improvements in those sources. The identified contextual information items are significant for practitioners in developing ways to augment their existing project history databases to make them more beneficial for estimators.

AB - Past project data sources provide key information for construction cost estimators. Previous research studies show that relying only on one's own experience during estimation results in estimators' bias. Having and referring to historical databases, containing objective information on what happened in past projects, are essential for reducing estimators' biases. The first step toward development of useful project history databases is to understand what information estimators require from past projects. The research described in this paper targets estimators' information needs identified through interviews, brainstorming sessions, task analyses, and card games conducted with estimators with different experience levels and specialized in heavy/civil and commercial construction projects, and exploration of historical and standard databases available in companies to determine what is being currently represented. Findings show that estimators need contextual information, depicting the conditions under which specific production rates were achieved, so that they can identify which production rate would be more realistic to use during the production rate estimation of an activity in a new bid. Comparison of the contextual information needs identified in this research with information items available in historical data sources (such as company cost reports, RSMeans, previous studies) highlighted some gaps and important opportunities for improvements in those sources. The identified contextual information items are significant for practitioners in developing ways to augment their existing project history databases to make them more beneficial for estimators.

KW - Construction management

KW - Costs

KW - Data collection

KW - Databases

KW - Decision support systems

KW - Information systems

UR - http://www.scopus.com/inward/record.url?scp=69149083688&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=69149083688&partnerID=8YFLogxK

U2 - 10.1061/(ASCE)CO.1943-7862.0000053

DO - 10.1061/(ASCE)CO.1943-7862.0000053

M3 - Article

VL - 135

SP - 841

EP - 852

JO - Journal of Construction Engineering and Management - ASCE

JF - Journal of Construction Engineering and Management - ASCE

SN - 0733-9364

IS - 9

ER -