BIM coverage in demand response management: A pilot study in campus buildings

Xinran Yu, Semiha Ergan

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

In the U.S., buildings account for a large portion of the total electricity consumption, which gives pressure on the national grid during peak hours. Demand response (DR) programs are attractive options to alleviate the pressure by incentivizing owners to reduce electricity usage during event times. Portfolio owners, who are willing to sign up for DR programs, need to work with third aggregator companies to generate customized curtailment protocols and determine the capacity of electricity reduction per building. These protocols provide alternative operations for buildings during the event with the aim to save electricity up to the capacity being enrolled. One of the challenges is that on-site facility managers (FMs) or off-site operators, who are responsible for executing protocols, struggle to collect accurate information of space occupancies and components, which results in compromises in electricity conservation and discomfort for occupants. Building information models (BIMs), which contain integrated facility information, can be leveraged to execute the curtailment protocols efficiently. Given these problems, the objectives are to first identify typically required facility information in managing DR events and then evaluate the capabilities of BIMs in providing such information in DR with the vision to control such actions from a central location. This paper presents the results of a case analysis on 20 campus buildings that are enrolled in DR programs. We extracted the essential information from the curtailment protocols and examined the possibility of retrieving such information in BIMs by analyzing industry foundation classes (IFC). The initial results show that BIMs can provide DR related information such as type and location of HVAC and lighting components, zoning details, and locations. The analysis results will serve as a foundational work for BIM and building automation system integration to aid DR events from a central location for efficiency instead of actions taken by FMs on-site.

Original languageEnglish (US)
Title of host publicationConstruction Research Congress 2018
Subtitle of host publicationConstruction Information Technology - Selected Papers from the Construction Research Congress 2018
PublisherAmerican Society of Civil Engineers (ASCE)
Pages316-325
Number of pages10
Volume2018-April
ISBN (Electronic)9780784481264
DOIs
StatePublished - Jan 1 2018
EventConstruction Research Congress 2018: Construction Information Technology, CRC 2018 - New Orleans, United States
Duration: Apr 2 2018Apr 4 2018

Other

OtherConstruction Research Congress 2018: Construction Information Technology, CRC 2018
CountryUnited States
CityNew Orleans
Period4/2/184/4/18

Fingerprint

Electricity
Managers
Zoning
Industry
Conservation
Automation
Lighting

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction

Cite this

Yu, X., & Ergan, S. (2018). BIM coverage in demand response management: A pilot study in campus buildings. In Construction Research Congress 2018: Construction Information Technology - Selected Papers from the Construction Research Congress 2018 (Vol. 2018-April, pp. 316-325). American Society of Civil Engineers (ASCE). https://doi.org/10.1061/9780784481264.031

BIM coverage in demand response management : A pilot study in campus buildings. / Yu, Xinran; Ergan, Semiha.

Construction Research Congress 2018: Construction Information Technology - Selected Papers from the Construction Research Congress 2018. Vol. 2018-April American Society of Civil Engineers (ASCE), 2018. p. 316-325.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Yu, X & Ergan, S 2018, BIM coverage in demand response management: A pilot study in campus buildings. in Construction Research Congress 2018: Construction Information Technology - Selected Papers from the Construction Research Congress 2018. vol. 2018-April, American Society of Civil Engineers (ASCE), pp. 316-325, Construction Research Congress 2018: Construction Information Technology, CRC 2018, New Orleans, United States, 4/2/18. https://doi.org/10.1061/9780784481264.031
Yu X, Ergan S. BIM coverage in demand response management: A pilot study in campus buildings. In Construction Research Congress 2018: Construction Information Technology - Selected Papers from the Construction Research Congress 2018. Vol. 2018-April. American Society of Civil Engineers (ASCE). 2018. p. 316-325 https://doi.org/10.1061/9780784481264.031
Yu, Xinran ; Ergan, Semiha. / BIM coverage in demand response management : A pilot study in campus buildings. Construction Research Congress 2018: Construction Information Technology - Selected Papers from the Construction Research Congress 2018. Vol. 2018-April American Society of Civil Engineers (ASCE), 2018. pp. 316-325
@inproceedings{00c2728b21ae478c95c3701594391134,
title = "BIM coverage in demand response management: A pilot study in campus buildings",
abstract = "In the U.S., buildings account for a large portion of the total electricity consumption, which gives pressure on the national grid during peak hours. Demand response (DR) programs are attractive options to alleviate the pressure by incentivizing owners to reduce electricity usage during event times. Portfolio owners, who are willing to sign up for DR programs, need to work with third aggregator companies to generate customized curtailment protocols and determine the capacity of electricity reduction per building. These protocols provide alternative operations for buildings during the event with the aim to save electricity up to the capacity being enrolled. One of the challenges is that on-site facility managers (FMs) or off-site operators, who are responsible for executing protocols, struggle to collect accurate information of space occupancies and components, which results in compromises in electricity conservation and discomfort for occupants. Building information models (BIMs), which contain integrated facility information, can be leveraged to execute the curtailment protocols efficiently. Given these problems, the objectives are to first identify typically required facility information in managing DR events and then evaluate the capabilities of BIMs in providing such information in DR with the vision to control such actions from a central location. This paper presents the results of a case analysis on 20 campus buildings that are enrolled in DR programs. We extracted the essential information from the curtailment protocols and examined the possibility of retrieving such information in BIMs by analyzing industry foundation classes (IFC). The initial results show that BIMs can provide DR related information such as type and location of HVAC and lighting components, zoning details, and locations. The analysis results will serve as a foundational work for BIM and building automation system integration to aid DR events from a central location for efficiency instead of actions taken by FMs on-site.",
author = "Xinran Yu and Semiha Ergan",
year = "2018",
month = "1",
day = "1",
doi = "10.1061/9780784481264.031",
language = "English (US)",
volume = "2018-April",
pages = "316--325",
booktitle = "Construction Research Congress 2018",
publisher = "American Society of Civil Engineers (ASCE)",

}

TY - GEN

T1 - BIM coverage in demand response management

T2 - A pilot study in campus buildings

AU - Yu, Xinran

AU - Ergan, Semiha

PY - 2018/1/1

Y1 - 2018/1/1

N2 - In the U.S., buildings account for a large portion of the total electricity consumption, which gives pressure on the national grid during peak hours. Demand response (DR) programs are attractive options to alleviate the pressure by incentivizing owners to reduce electricity usage during event times. Portfolio owners, who are willing to sign up for DR programs, need to work with third aggregator companies to generate customized curtailment protocols and determine the capacity of electricity reduction per building. These protocols provide alternative operations for buildings during the event with the aim to save electricity up to the capacity being enrolled. One of the challenges is that on-site facility managers (FMs) or off-site operators, who are responsible for executing protocols, struggle to collect accurate information of space occupancies and components, which results in compromises in electricity conservation and discomfort for occupants. Building information models (BIMs), which contain integrated facility information, can be leveraged to execute the curtailment protocols efficiently. Given these problems, the objectives are to first identify typically required facility information in managing DR events and then evaluate the capabilities of BIMs in providing such information in DR with the vision to control such actions from a central location. This paper presents the results of a case analysis on 20 campus buildings that are enrolled in DR programs. We extracted the essential information from the curtailment protocols and examined the possibility of retrieving such information in BIMs by analyzing industry foundation classes (IFC). The initial results show that BIMs can provide DR related information such as type and location of HVAC and lighting components, zoning details, and locations. The analysis results will serve as a foundational work for BIM and building automation system integration to aid DR events from a central location for efficiency instead of actions taken by FMs on-site.

AB - In the U.S., buildings account for a large portion of the total electricity consumption, which gives pressure on the national grid during peak hours. Demand response (DR) programs are attractive options to alleviate the pressure by incentivizing owners to reduce electricity usage during event times. Portfolio owners, who are willing to sign up for DR programs, need to work with third aggregator companies to generate customized curtailment protocols and determine the capacity of electricity reduction per building. These protocols provide alternative operations for buildings during the event with the aim to save electricity up to the capacity being enrolled. One of the challenges is that on-site facility managers (FMs) or off-site operators, who are responsible for executing protocols, struggle to collect accurate information of space occupancies and components, which results in compromises in electricity conservation and discomfort for occupants. Building information models (BIMs), which contain integrated facility information, can be leveraged to execute the curtailment protocols efficiently. Given these problems, the objectives are to first identify typically required facility information in managing DR events and then evaluate the capabilities of BIMs in providing such information in DR with the vision to control such actions from a central location. This paper presents the results of a case analysis on 20 campus buildings that are enrolled in DR programs. We extracted the essential information from the curtailment protocols and examined the possibility of retrieving such information in BIMs by analyzing industry foundation classes (IFC). The initial results show that BIMs can provide DR related information such as type and location of HVAC and lighting components, zoning details, and locations. The analysis results will serve as a foundational work for BIM and building automation system integration to aid DR events from a central location for efficiency instead of actions taken by FMs on-site.

UR - http://www.scopus.com/inward/record.url?scp=85048674210&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85048674210&partnerID=8YFLogxK

U2 - 10.1061/9780784481264.031

DO - 10.1061/9780784481264.031

M3 - Conference contribution

AN - SCOPUS:85048674210

VL - 2018-April

SP - 316

EP - 325

BT - Construction Research Congress 2018

PB - American Society of Civil Engineers (ASCE)

ER -