A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial backordering for deteriorating items

Ali Diabat, Ata Allah Taleizadeh, Mohsen Lashgari

    Research output: Contribution to journalArticle

    Abstract

    In practice, installment of cost of lots is very common between manufacturers and distributors, and many distributors pay the purchasing cost in equal installments (i.e., an upstream partial prepayment). In a similar fashion, distributors allow retailers to pay the cost of purchased goods after such goods are received (i.e., a downstream partial delay payment). In this research we apply a model of economic order quantity (EOQ) in supply chains with partial downstream delayed payment and partial upstream advance payment for a deteriorating item under three conditions: 1) shortage is not allowed, 2) full back ordering is allowed, and 3) partial back ordering is allowed. We prove the convexity of the cost functions and derive closed form global optimal solutions for the decision variables of all models. Eventually, to demonstrate the theoretical results and managerial options, we perform some computational examples.

    Original languageEnglish (US)
    Pages (from-to)322-342
    Number of pages21
    JournalJournal of Manufacturing Systems
    Volume45
    DOIs
    StatePublished - Oct 1 2017

    Fingerprint

    Costs
    Purchasing
    Cost functions
    Supply chains
    Economics

    Keywords

    • Advance payment
    • Deteriorating items
    • Lot sizing
    • Trade credit

    ASJC Scopus subject areas

    • Control and Systems Engineering
    • Software
    • Hardware and Architecture
    • Industrial and Manufacturing Engineering

    Cite this

    A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial backordering for deteriorating items. / Diabat, Ali; Taleizadeh, Ata Allah; Lashgari, Mohsen.

    In: Journal of Manufacturing Systems, Vol. 45, 01.10.2017, p. 322-342.

    Research output: Contribution to journalArticle

    @article{685846dffc5d41478a67b209a294dd21,
    title = "A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial backordering for deteriorating items",
    abstract = "In practice, installment of cost of lots is very common between manufacturers and distributors, and many distributors pay the purchasing cost in equal installments (i.e., an upstream partial prepayment). In a similar fashion, distributors allow retailers to pay the cost of purchased goods after such goods are received (i.e., a downstream partial delay payment). In this research we apply a model of economic order quantity (EOQ) in supply chains with partial downstream delayed payment and partial upstream advance payment for a deteriorating item under three conditions: 1) shortage is not allowed, 2) full back ordering is allowed, and 3) partial back ordering is allowed. We prove the convexity of the cost functions and derive closed form global optimal solutions for the decision variables of all models. Eventually, to demonstrate the theoretical results and managerial options, we perform some computational examples.",
    keywords = "Advance payment, Deteriorating items, Lot sizing, Trade credit",
    author = "Ali Diabat and Taleizadeh, {Ata Allah} and Mohsen Lashgari",
    year = "2017",
    month = "10",
    day = "1",
    doi = "10.1016/j.jmsy.2017.04.005",
    language = "English (US)",
    volume = "45",
    pages = "322--342",
    journal = "Journal of Manufacturing Systems",
    issn = "0278-6125",
    publisher = "Elsevier",

    }

    TY - JOUR

    T1 - A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial backordering for deteriorating items

    AU - Diabat, Ali

    AU - Taleizadeh, Ata Allah

    AU - Lashgari, Mohsen

    PY - 2017/10/1

    Y1 - 2017/10/1

    N2 - In practice, installment of cost of lots is very common between manufacturers and distributors, and many distributors pay the purchasing cost in equal installments (i.e., an upstream partial prepayment). In a similar fashion, distributors allow retailers to pay the cost of purchased goods after such goods are received (i.e., a downstream partial delay payment). In this research we apply a model of economic order quantity (EOQ) in supply chains with partial downstream delayed payment and partial upstream advance payment for a deteriorating item under three conditions: 1) shortage is not allowed, 2) full back ordering is allowed, and 3) partial back ordering is allowed. We prove the convexity of the cost functions and derive closed form global optimal solutions for the decision variables of all models. Eventually, to demonstrate the theoretical results and managerial options, we perform some computational examples.

    AB - In practice, installment of cost of lots is very common between manufacturers and distributors, and many distributors pay the purchasing cost in equal installments (i.e., an upstream partial prepayment). In a similar fashion, distributors allow retailers to pay the cost of purchased goods after such goods are received (i.e., a downstream partial delay payment). In this research we apply a model of economic order quantity (EOQ) in supply chains with partial downstream delayed payment and partial upstream advance payment for a deteriorating item under three conditions: 1) shortage is not allowed, 2) full back ordering is allowed, and 3) partial back ordering is allowed. We prove the convexity of the cost functions and derive closed form global optimal solutions for the decision variables of all models. Eventually, to demonstrate the theoretical results and managerial options, we perform some computational examples.

    KW - Advance payment

    KW - Deteriorating items

    KW - Lot sizing

    KW - Trade credit

    UR - http://www.scopus.com/inward/record.url?scp=85031327942&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=85031327942&partnerID=8YFLogxK

    U2 - 10.1016/j.jmsy.2017.04.005

    DO - 10.1016/j.jmsy.2017.04.005

    M3 - Article

    VL - 45

    SP - 322

    EP - 342

    JO - Journal of Manufacturing Systems

    JF - Journal of Manufacturing Systems

    SN - 0278-6125

    ER -