No photo of Fletcher Griffis

Fletcher Griffis

Full Professor

1966 …2017
If you made any changes in Pure, your changes will be visible here soon.

Research Output 1966 2017

Filter
Article
2014

Productividad Automatizada Basada en el Itinerario Animado (APBSA): Una Simulacion Basada en un Enfoque del Analisis de Compensacion Tiempo-Costo

Translated title of the contribution: Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysisGelisen, G. & Griffis, F., Apr 1 2014, In : Journal of Construction Engineering and Management. 140, 4, B4013007.

Research output: Contribution to journalArticle

Animation
Productivity
Costs
Time costs
Simulation
2013

A framework for an automated and integrated project scheduling and management system

Chen, S. M., Griffis, F., Chen, P. H. & Chang, L. M., 2013, In : Automation in Construction. 35, p. 89-110 22 p.

Research output: Contribution to journalArticle

Scheduling
Computer aided design
Costs

Design of public projects: Outsource or in-house?

Griffis, F. & Choi, H., Jan 1 2013, In : Journal of Management in Engineering. 29, 1, p. 2-9 8 p.

Research output: Contribution to journalArticle

Costs
Engineers
Personnel
Cost effectiveness
Public project
2012

Project specific, driven based contingency estimating model in construction

Liu, M., Griffis, F. & Bates, A., 2012, In : Journal of Management in Engineering.

Research output: Contribution to journalArticle

Simulation and analytical techniques for construction resource planning and scheduling

Chen, S. M., Griffis, F., Chen, P. H. & Chang, L. M., Jan 2012, In : Automation in Construction. 21, 1, p. 99-113 15 p.

Research output: Contribution to journalArticle

Scheduling
Planning
Managers
Seats
Software packages
2007

Engineering failures exposed by Hurricane Katrina

Griffis, F., Apr 2007, In : Technology in Society. 29, 2, p. 189-195 7 p.

Research output: Contribution to journalArticle

Hurricanes
natural disaster
engineering
major event
Levees
2005

Addressing pricing: Value bidding for engineers and consultants

Sturts, C. S. & Griffis, F., Jun 2005, In : Journal of Construction Engineering and Management. 131, 6, p. 621-630 10 p.

Research output: Contribution to journalArticle

Engineers
Marketing
Costs
Analytical models
Profitability

Pricing engineering services

Sturts, C. S. & Griffis, F., Apr 2005, In : Journal of Management in Engineering. 21, 2, p. 56-62 7 p.

Research output: Contribution to journalArticle

Costs
Personnel
Engineers
Industry
Pricing
2004

Qualifications-based selection of professional A/E services

Christodoulou, S., Griffis, F., Barrett, L. & Okungbowa, M., Apr 2004, In : Journal of Management in Engineering. 20, 2, p. 34-41 8 p.

Research output: Contribution to journalArticle

Costs
Audition
Engineers
Service engineering
Qualification
2000

Construction risk analysis tool for determining liquidated damages insurance premiums: Case study

Griffis, F. & Christodoulou, S., Nov 2000, In : Journal of Construction Engineering and Management. 126, 6, p. 407-413 7 p.

Research output: Contribution to journalArticle

Insurance
Risk analysis
Risk management
Managers
Engineers
1997
1995

Reengineering infrastructure research

Griffis, F., 1995, In : Journal of Professional Issues in Engineering Education and Practice. 121, 1, p. 11-18 8 p.

Research output: Contribution to journalArticle

Reengineering
Project management
Industry
1992

ADR, TQM, partnering, and other management fantasies

Griffis, F., 1992, In : Journal of Professional Issues in Engineering Education and Practice. 118, 4, p. 331-344 14 p.

Research output: Contribution to journalArticle

Total quality management
Construction industry
Productivity
Industry
Partnering

Bidding strategy: Winning overkey competitors

Griffis, F., 1992, In : Journal of Construction Engineering and Management. 118, 1, p. 151-165 15 p.

Research output: Contribution to journalArticle

Probability density function
Distribution functions
Competitors
Bidding strategy
Costs
1991

Integration of engineering, design, and construction

Reinschmidt, K. F., Griffis, F. & Bronner, P. L., 1991, In : Journal of Construction Engineering and Management. 117, 4, p. 756-772 17 p.

Research output: Contribution to journalArticle

Productivity
Construction industry
Industrial engineering
Electrical engineering
Mechanical engineering

The application of total quality management on JFK2000

Griffis, F., Jan 1991, In : Transportation Research Board.

Research output: Contribution to journalArticle

1990

Meeting issues of preventive maintenance for New York city bridges

Bieniek, M. P., Griffis, F., Gokhale, S. & Schwartz, S. I., 1990, In : Journal of Professional Issues in Engineering Education and Practice. 116, 4, p. 323-332 10 p.

Research output: Contribution to journalArticle

Preventive maintenance
Civil engineering
Computer systems
Rivers
Scheduling

The application of three-dimensional computer models on construction sites

Griffis, F., Bronner, P. & O'Brien, W. J., May 1990, In : Architecture and Engineering Systems.

Research output: Contribution to journalArticle

1988

Case for cost-plus contracting

Griffis, F. & Butler, M., 1988, In : Journal of Construction Engineering and Management. 114, 1, p. 83-94 12 p.

Research output: Contribution to journalArticle

Costs
Contractors
Drag
Contracting
Personnel
1986

Revamping Fort Drum

Griffis, F., 1986, The Military Engineer.

Research output: Contribution to specialist publicationArticle

Time-cost trade-off at Hanscom AFB

Griffis, F., 1986, The Military Engineer.

Research output: Contribution to specialist publicationArticle

1975

Dredging and the environment.

Meccia, R. M., Griffis, F. & Army, U. S., Jan 1 1975, In : [No source information available].

Research output: Contribution to journalArticle

Dredging
Operations Research
Research and Development
Operations research
1966

The cable-tramway system on Hill 651

Griffis, F., 1966, The Military Engineer.

Research output: Contribution to specialist publicationArticle