Photo of Borja Garcia de Soto

Borja Garcia de Soto

Assistant Professor

    20092020

    Research output per year

    If you made any changes in Pure these will be visible here soon.

    Fingerprint Weighted list of dominant concepts in the researcher's publications (titles and abstracts).

    Network Recent external collaboration on country level. Dive into details by clicking on the dots.

    Research Output

    BIM-based estimation of vertical transportation demands during the construction of high-rise buildings

    Wu, K., García de Soto, B., Adey, B. T. & Zhang, F., Feb 2020, In : Automation in Construction. 110, 102985.

    Research output: Contribution to journalArticle

  • Spatio-temporal planning for tower cranes in construction projects with simulated annealing

    Wu, K., García de Soto, B. & Zhang, F., Mar 2020, In : Automation in Construction. 111, 103060.

    Research output: Contribution to journalArticle

  • Automatic generation of the vertical transportation demands during the construction of high-rise buildings using BIM

    Wu, K., Garcia de Soto, B., Adey, B. T. & Zhang, F., Jan 1 2019, p. 99-106. 8 p.

    Research output: Contribution to conferencePaper

  • BIM-based Last Planner System tool for improving construction project management

    Heigermoser, D., Garcia de Soto, B., Abbott, E. L. S. & Chua, D. K. H., Aug 1 2019, In : Automation in Construction. 104, p. 246-254 9 p.

    Research output: Contribution to journalArticle

  • Designing a reliable fiducial marker network for autonomous indoor robot navigation

    Mantha, B. R. K. & Garcia de Soto, B., Jan 1 2019, p. 74-81. 8 p.

    Research output: Contribution to conferencePaper